01 / EV chargers
Services / 02 of 08

EV charger installs.

Home · Workplace · Load managed

Home and workplace charger installs, load-managed so the rest of the board stays happy. We check the supply before anything is ordered.

Quote this → All services

What it covers

5 parts · select one for the full scope
02.1 · Scope of works

Supply check

Before a charger is ordered, we confirm the supply and switchboard can carry it.

AS/NZS 3000 AS/NZS 3008.1.1
Quote this →
Included
  1. 01Main switchboard inspection
  2. 02Maximum demand calculation
  3. 03Single or three phase confirmation
  4. 04Spare capacity and circuit space
  5. 05Earthing and RCD check
  6. 06Network notification requirements
On completion
  • Supply report with recommended charger rating
  • Board upgrade scope, if needed
  • Itemised quote
02.2 · Scope of works

Charger choice

The right charger for the vehicle, the supply and the way you drive, in wall or pedestal form.

IEC 61851 AS/NZS 3000
Quote this →
Included
  1. 017kW single phase and 22kW three phase options
  2. 02Tethered or socketed units
  3. 03Wall, post or pedestal mounting
  4. 04Smart app control and scheduling
  5. 05Weather rating for outdoor installs
  6. 06Multi-bay units for workplaces
On completion
  • Recommended unit with datasheet
  • Charge-time estimate for your vehicle
  • Warranty terms
02.3 · Scope of works

Load management

Charging is balanced against the rest of the property, so the main supply is never overloaded.

AS/NZS 3000
Quote this →
Included
  1. 01Current sensing on the main supply
  2. 02Dynamic load balancing set-up
  3. 03Current limits configured to the board
  4. 04Shared capacity across multiple bays
  5. 05Off-peak scheduling
  6. 06Testing under combined load
On completion
  • Configured load limits on record
  • Test results under load
  • App settings handed over
02.4 · Scope of works

Solar-aware charging

Where you have solar, the charger can follow excess generation instead of drawing from the grid.

AS/NZS 4777.1
Quote this →
Included
  1. 01Integration with your inverter or meter
  2. 02Solar-only and solar-boost modes
  3. 03Export limit coordination
  4. 04Battery priority settings
  5. 05Solar-to-car energy monitoring
  6. 06Configuration tested in generation
On completion
  • Charging modes set up and explained
  • Monitoring access
  • Settings summary
02.5 · Scope of works

Cable routing

Cable runs are planned with you before work starts, so the finished install is tidy and protected.

AS/NZS 3000 AS/NZS 3008.1.1
Quote this →
Included
  1. 01Route agreed on site
  2. 02Cable sized for length and voltage drop
  3. 03Conduit, trenching or ceiling runs
  4. 04Dedicated circuit with RCBO protection
  5. 05Isolator at the charger
  6. 06Make-good of penetrations
On completion
  • Circuit labelled at the board
  • Certificate of compliance
  • Photos of concealed runs
Typical jobs

A garage charger fed from an upgraded board. Several bays at a workplace sharing one supply.

What we look at first
Supply Single or three phase, and what capacity is spare.
Distance Board to parking spot, and the route between.
Vehicle Onboard charger rating and how far you drive.

Quote your charger.

Request a call back →

Tell us the site and what you want powered. We come back with an itemised price and a date.

EC16867  ·  PL 11344  ·  GF 24561  ·  S6164924  ·  Public liability insured to $20,000,000 with QBE